|
MESH AND PUTTY |
|
Forum | Contact us | Gallery | What´s News |IPMS| Events | Links | Magazine Modelismo del Sur |
Author:
Jose Luis Crespo
Is common that who buys a scale
model for the first time, runs to its house and in any corner submerges in the
construction without but tools that a pair of scissors and the glue, with the
own anxieties and impatience of that construct its first model... the main are
always finish it, and on the finished model just the errors were analyzed, that
surely will be many less in the next model.
This note exactly tries to
contribute in some advice for whom begin, trying to shorten the time to finish
an acceptable and detailed model. In these last years the quality of many works
is surprising, is enough to compare the last models awarded in different
national and foreign contests with which made ten years ago, product it of a
correct and rational application of the tools, in addition of the kits
improvement.
Despite the saying, in many assembled models is presented unevennesses and differences of fit that must be solved by the modeller, and consider to it:
1)
Before gluing, consults the
instruction sheet with attention and prove the parts to unite.-
2)
Applies little glue in the tie
points, so that not spilled on the plastic surfaces.-
3) Sticks the pieces and hopes at least five or six hours to continue.-
4)
Once dry, sand the differences
with a fine sandpaper, we recommended for it, the 1200 number, in this point is
important to emphasize the flexible sandpapers, like 3M, that allow the sanding
in hard accessible places.-
5)
Prepare the putty in a metallic
container, diluting it with acetone in few proportions.-
6)
If exists much unevenness
applies the putty on the sector that displays the depression.-
7)
Passed at least 12 hours sand
it again on the surface with putty, trying to uniform the surface.-
What putty brand is more recommendable, we cannot judge the quality of all, nevertheless there are certain brands that have a good performance, emphasizing the Tamiya and Testor putty, that undergo minimum alterations or contractions in the drying. At the moment some IPMS Alto Valle partners are applying PPG brand, of use in car painting factories, with excellent results.